100kW Wind Turbine, Easton Pond Business Center

Middletown, Rhode Island

SGE has been retained to provide engineering and construction program management services for the installation of a 100kW wind turbine to provide 60-70% of the power needs for the business center. SGE has conducted wind studies and installed a 120′ meteorological tower on site to measure wind speeds. Permits are in place, and SGE has started the design and procurement phase. The project is expected to be completed in the Fall of 2009, and this will be the first wind turbine in Middletown RI and the first wind turbine in the State of Rhode Island to power a commercial building.

Click here for installation and construction pictures and updates

Click here to see the wind turbine simulation videos

Services Provided 

  • Feasibility study
  • Energy assessment study
  • Financial modeling
  • Permitting
  • Foundation design
  • Geotechnical investigations
  • Site design 
  • Procurement
  • Installation
  • Construction
  • Testing
  • Commissioning
  • Power connection