A proposed wind power project requires very precise site wind measurements to determine the economic value of the energy that can be produced to a high probability.
Wind measurements can last anywhere from 3 to 12 months depending on data collected during the mapping phase to accurately reflect wind conditions. Meteorological towers and sodar equipments are used to measure wind speeds.
55 John Clarke Road, Middletown RI 02842 · p 401.849.0810 · f 401.846.4169 · info@sge-corp.com · © 2009 SGE. All rights reserved. · site by C. Murray Consulting